CITY OF GLENDALE – GLENDALE FIRE DEPARTMENT
FACILITY FEASIBILITY STUDY

Fire Stations and Emergency Response Facilities
CITY OF GLENDALE – GLENDALE FIRE DEPARTMENT  <br/>   FACILITY FEASIBILITY STUDY

In June of 2025, the City of Glendale and the Glendale Fire Department hired DeWees Design to develop a comprehensive and detailed Facility Feasibility Study to augment a previous City-wide Facility Feasibility Study.  The Scope of Work for the project was based on the following criteria:

  • Develop a Facility Feasibility Study to for the three Fire Station projects that were deemed the most critical.
  • The three Subject Fire Stations are:

     Fire Station #26 – Brand Avenue

     Fire Station #28 – New York Avenue

     Fire Station #29 – Honolulu Avenue   

 

The specific Scope of Work for the Study was based on the following criteria:

  • Conduct On-Site Field Investigations of all three Fire Stations.
  • Develop an Existing Architectural Program for all three Fire Stations.
  • Develop prototypical programmatic spaces.
  • Develop a Proposed Architectural Program for all three Fire Stations.
  • Develop Proposed Conceptual Site Plans.
  • Develop Floor Plan Diagrams.
  • Develop Conceptual 3D exterior images.
  • Generate Rough Order of Magnitude (R.O.M.) Construction Cost Estimates.

DeWees Design was charged with developing the Facility Feasibility Study under the auspices of the following City Departments:

  • City of Glendale Public Works Senior Project Manager.
  • City of Glendale Deputy Fire Chief
  • City of Glendale Public Libraries Director

The final Facility Feasibility Study was issued to the City of Glendale and the Glendale Fire Department in October 2025.   The City of Glendale will use this Study in order to generate a Bond Measure that is scheduled to be put on the City of Glendale Election Ballot in November of 2026.

Pages from 100% FINAL SUBMITTAL-OCTOBER 23, 2025 Page 001

FIRE STATION #26 - PROPOSED CONCEPTUAL SITE PLAN STUDY

Pages from 100% FINAL SUBMITTAL-OCTOBER 23, 2025 Page 003

FIRE STATION #26 - PROPOSED FLOOR PLAN STUDY

STATION #29 PROPOSED-IMAGE #01 STATION #29 PROPOSED-IMAGE #02

3D IMAGES - EXTERIOR - STREET LEVEL

STATION #29 PROPOSED-IMAGE #01-CLOSE-#01 STATION #29 PROPOSED-IMAGE #02-CLOSE #02

3D IMAGES - EXTERIOR - STREET LEVEL

FIRE STATION #28 - PROPOSED CONCEPTUAL SITE PLAN STUDY

FIRE STATION #28 - PROPOSED CONCEPTUAL SITE PLAN STUDY

Pages from 100% FINAL SUBMITTAL-OCTOBER 23, 2025 Page 006

FIRE STATION #28 - PROPOSED FLOOR PLAN STUDY

3D IMAGES - EXTERIOR - STREET LEVEL

3D IMAGES - EXTERIOR - STREET LEVEL

3D IMAGES - EXTERIOR - STREET LEVEL

3D IMAGES - EXTERIOR - STREET LEVEL

3D IMAGES - EXTERIOR - STREET LEVEL

3D IMAGES - EXTERIOR - STREET LEVEL

Pages from 100% FINAL SUBMITTAL-OCTOBER 23, 2025 Page 007 Pages from 100% FINAL SUBMITTAL-OCTOBER 23, 2025 Page 008

FIRE STATION #29 - PROPOSED CONCPETUAL SITE PLAN STUDIES

Pages from 100% FINAL SUBMITTAL-OCTOBER 23, 2025 Page 010

FIRE STATION #29 - PROPOSED FLOOR PLAN STUDIES

STATION #29 PROPOSED-IMAGE #01

3D IMAGES EXTERIOR - STREET LEVEL

3D IMAGES EXTERIOR - STREET LEVEL

3D IMAGES EXTERIOR - STREET LEVEL